Greenhouse Construction

Heat pipes arrived in November and are stored on site for assembly after the structural glass roof is installed. These steel pipes will be welded to provide hot water heating from the gas/oil boilers located in the headhouse.

Dr. Thomas Handwerker, Director
Small Farm Institute, UMES
email: Tshandwerker@mail.umes.edu