Greenhouse Construction

All the electrical conduit and plumbing conduits are installed. Each is labeled and tested for seal as specifications have implied. A final layer of sand/clay fill is applied, leveled, and compacted. Rainy weather delayed the concrete pour for several days.

Dr. Thomas Handwerker, Director
Small Farm Institute, UMES
email: Tshandwerker@mail.umes.edu