Greenhouse Construction |
The sand/clay base of the headhouse floor is covered with a plastic vapor barrier with a wire-frame web laid down for reinforcing. The concrete pumping truck is positioned while waiting for the readymix concrete to arrive at the site. Pouring was started by 7:30 AM.
|