Greenhouse Construction
The base floor of the 6,000 square foot headhouse is prepared and the concrete trucks arrive. The readymix concrete trucks empty two-at-a-time into a pumping truck. The entire floor is poured within three hours.
Dr. Thomas Handwerker, Director
Small Farm Institute, UMES
email: Tshandwerker@mail.umes.edu